 Mattern & Craig was commissioned by the Town of St. Paul, Virginia to perform an engineering study and report, design, procurement, and construction administration services for a new, regional wastewater treatment plant.  The WWTP has an initial treatment capacity of 0.5 MGD with the ability to expand to 0.75 MGD for future growth.  The regional plant treats wastewater collected from three regional partners:  the Town of St. Paul, Castlewood Water & Sewer Authority, and Wise County Public Service Authority.

To facilitate construction of the new plant, an existing treatment lagoon had to be decommissioned and became the site for the regional plant.  A collection system connection was performed between Castlewood Water & Sewer and the Town’s system across the US 58 bridge in St. Paul.

The anticipated completion date of the WWTP is Spring 2016  with a total estimated cost of $5.2 million.

St Paul WWTP 030916

NEW! – Construction Site Video from MC1:  

Watch Construction Progress here:

Construction photos:

St Paul WWTP 030916 II

IMG_20141125_092105484 IMG_20150120_133133532 IMG_20141125_091355806 IMG_20141023_091431489  SAM_0398   2921S-007-II